Basement renovation permits in York Region: what the work triggers
A basement renovation permit comes down to plumbing, a new bedroom and a second unit in York Region. Plain finishing is where East Gwillimbury, Newmarket, Aurora and King part ways.
- Published
- Reading time
- 9 min read
- Written by
- Sonce Homes

Do you need a basement renovation permit?
You need a basement renovation permit once the work adds plumbing, moves or removes walls, touches the structure, creates a bedroom or makes a second unit. Replacing worn finishes usually does not need one. In Newmarket, finishing a basement is on the permit list by itself.
The starting rule is provincial. King's building page puts it this way: under the Building Code Act, a permit is required to construct, demolish, renovate, alter, install or change the use of a building. [Township of King] The four building offices that cover Sonce's towns then say which basement jobs that takes in. Newmarket lists finishing a basement. [Town of Newmarket] Aurora does not require a permit to finish a basement with no structural alteration and no added sleeping accommodation, though its zoning by-law still applies. [Town of Aurora] East Gwillimbury requires a permit before most renovation projects and asks owners to call Building to confirm. [Town of East Gwillimbury]
So the same drywall and flooring job can be permit work in Newmarket and not in Aurora.
Which work needs a building permit for a basement renovation?
Plumbing, a new bedroom and a second unit are what to look for in the table. It gives each office's own wording for what needs a permit and what usually does not, trimmed to basement work. The East Gwillimbury row also answers for Holland Landing homes, and the King row for King City.
| Building office | Needs a permit | Usually does not |
|---|---|---|
| East Gwillimbury (also Holland Landing) | Most renovation work, and installing plumbing. The Town asks owners to call Building to confirm. | Replacing finishes on a non-load-bearing interior wall, and floor or ceiling finishes, that are not part of a required fire separation. Damp-proofing repairs to foundation walls that need no plumbing, shoring or underpinning. |
| Newmarket | Finishing a basement, adding or removing walls, HVAC and plumbing alterations, creating an additional residential unit. | Floor and ceiling finishes, waterproofing repairs with no plumbing, replacing a furnace with no building alterations. |
| Aurora | A finished basement that includes a structural alteration or additional sleeping accommodation. An alteration may also need a separate plumbing permit. | Finishing a basement with no structural alteration and no additional sleeping accommodation, though the zoning by-law and, where it applies, the Building Code still do. |
| King (also King City) | Installing new plumbing, adding or removing a structural wall, completing a roughed-in bathroom, altering a building or its plumbing. | Damp-proofing basements. |
Every cell comes from the office's own page. [Town of East Gwillimbury] [Town of Newmarket] [Town of Aurora] [Township of King]
Finishes and damp-proofing sit mostly on the exempt side, with limits. East Gwillimbury's exemption for finishes stops at a required fire separation, and its damp-proofing exemption stops where plumbing, shoring or underpinning is needed. Newmarket's waterproofing exemption stops where plumbing is involved, and King lists damp-proofing basements with no condition. Read together, Newmarket's two lists make finishing a basement permit work and replacing a floor or ceiling finish not.
Plumbing and the mechanical system sit on the permit side. Newmarket counts HVAC and plumbing alterations, though replacing a furnace with no building alterations is typically exempt. Aurora warns that an alteration permit may need a separate plumbing permit, so a basement bathroom there can mean two applications. King lists completing a roughed-in bathroom by name: a rough-in already in place does not take the bathroom off the list.
Walls are worded differently. Newmarket lists adding or removing walls without qualification, while King's list says a structural wall. If a layout moves any wall, ask the office which wording applies to yours.
Does a new bedroom in the basement change the answer?
In Aurora it does. The Town's exemption for finishing a basement applies only where no additional sleeping accommodation is proposed, so a new bedroom turns a finish into permit work even when no wall is structural. [Town of Aurora] The other three offices do not word a bedroom rule on the pages quoted here, so ask rather than assume.
A bedroom also brings a window. A bedroom below grade needs a window large enough to climb out of; where the existing windows are too small they are enlarged, which is structural work and part of the permit. Our post on basement egress window requirements covers the opening size and the window well.
The Building Code also covers ceiling height. None of the town pages quoted here gives a minimum, so this post does not either: ask the building office for the figure before the layout is drawn.
What goes in with the application: drawings and forms
Newmarket's permit page lists the forms, and the list shows how much the plumbing and heating decide.
- Schedule 1, Designer Information. Required when the homeowner, or a qualified designer who is not an architect or engineer, takes responsibility for the design.
- HVAC design summary. The residential mechanical ventilation and heating and cooling design summary.
- Mechanical drawings. Required when the work changes or adds to the mechanical system. They may be marked on the floor plans, and the Town may also ask for a heat loss and heat gain calculation to size the furnace, plus duct design and layout drawings by a qualified designer.
[Town of Newmarket]
That is why a bathroom or a moved duct run brings paperwork that paint and a new floor do not. For the other three offices, ask for the current submission list before anything is drawn.
How long does a basement renovation permit take to review?
Newmarket says about 10 to 15 working days once an application is complete. [Town of Newmarket] King says most reviews take 10 business days, after an intake of up to five. [Township of King] East Gwillimbury and Aurora give no number on the pages quoted here. What each office says about applying shows where the clock starts.
- East Gwillimbury. An application is pre-screened first, and the date of application is the date pre-screening is approved. Reviews and resubmissions are electronic. [Town of East Gwillimbury]
- Newmarket. The clock starts once the form, the fees and all submission requirements are in and judged complete. If the permit will not be issued, the Town sends a deficiency letter listing what has to be fixed. [Town of Newmarket]
- Aurora. Applications go through the Town's online portal, by email to the Building Division or on a USB drive handed in. Missing information or payment may delay processing. [Town of Aurora]
- King. The Township will not accept an application until applicable law is satisfied. [Township of King]
Zoning comes first in more than one place. Newmarket requires a Zoning Preliminary Review before the building permit application for an additional residential unit. [Town of Newmarket] King's applicable-law rule has the same effect on the order of work, since nothing is accepted until it is satisfied. [Township of King]
What these pages say slows a review is a gap in the application: a deficiency letter in Newmarket, missing information or payment in Aurora. That part is in the owner's hands.
Which inspections happen once work starts?
In King the permit answers it. It comes with an Inspection Notice Sheet listing the inspections required at specified stages of construction, and requests are made online. The permit closes once every required inspection, the final included, has been passed. [Township of King]
The other offices handle it their own way. Newmarket asks you to print the permit card and post it in a conspicuous place on the property. [Town of Newmarket] Aurora takes inspection requests through the same online portal used to apply. [Town of Aurora]
The only stage these pages name is the final inspection. Whether your job also needs plumbing, framing or insulation inspections is on the notice sheet in King; elsewhere, ask when the permit is issued, and before any wall is closed in.
When a basement becomes a legal basement apartment
A basement is a second unit when it has its own private entrance, a kitchen, living quarters, sleeping facilities and a bathroom. That is Newmarket's test for an additional residential unit, or ARU, and the Town names basement apartments and in-law suites among them. Renting a room while sharing the entrance, kitchen or bathroom does not make one. [Town of Newmarket]
Once the basement is a unit, the offices add steps of their own.
- Newmarket. A Zoning Preliminary Review comes before the building permit application. [Town of Newmarket] Each ARU needs one exterior parking space on top of the main dwelling's two, so a house with one ARU needs three. The spaces have to sit within the maximum driveway width, between the garage and the sidewalk or curb, perpendicular to the street, and none can be in a garage. [Town of Newmarket]
- East Gwillimbury. Contact Planning first about parking spaces and sewer capacity, check that the zoning allows a secondary unit or accessory apartment, then apply for the building permit. Every accessory apartment application also gets a Fire Department review. [Town of East Gwillimbury]
- Aurora. Zoning By-law 6000-17 permits second suites in detached, semi-detached and link houses, subject to certain provisions. Creating a two-unit house takes a Change of Use Permit or a Building Permit, and the owner must schedule an inspection with the Electrical Safety Authority. [Town of Aurora]
- King. We found no second-unit page from the Township to quote. Ask its Building Division what applies to your lot before a layout is drawn.
Registering a basement unit, and what an unpermitted one faces
In Newmarket a home with an ARU has to be registered with the Town, a rule in place since 2013 under By-law 2013-13, as amended. [Town of Newmarket]
A new ARU is built under a building permit, and the registration application goes in after the work is finished, with four documents:
- The final building inspection report.
- A compliance report from the Electrical Safety Authority for both the upper and lower units, dated within six months of the application.
- A sketch of the parking area with dimensions.
- The completed and signed ARU application form.
[Town of Newmarket]
An existing unit built before 1995 files a letter from Central York Fire Services instead of the final inspection report, dated within six months of the application and saying the unit complies with the Fire Code. [Town of Newmarket] A unit built without a permit in 1995 or later fits neither case. Newmarket's page gives a new unit one route, a building permit and the final inspection report, and lists no other way in, so call the Building office before spending anything on it.
In Aurora an existing two-unit house needs a Change of Use Permit or Building Permit just as a new one does, and two-unit houses are registered with the Building Services Division. [Town of Aurora]
Is an ESA notification the same as a building permit?
No. The Electrical Safety Authority says electrical notifications are not the same as a building permit, and a job may need both. [Electrical Safety Authority]
A second unit shows it in the paperwork. Newmarket wants the ESA compliance report for both units before it registers a new one, and Aurora tells owners of a two-unit house to schedule an ESA inspection. [Town of Newmarket] [Town of Aurora] The building permit does not stand in for either.
If the basement gets new wiring, ask who is handling the ESA side.
Basement permit fees and when they are due
Fees are described here, never quoted, so ask the office for its current schedule before you budget. What the pages do say is where fees affect the timing. Newmarket treats an application as complete only when the form, the fees and all submission requirements are in, and its review clock starts then. [Town of Newmarket] Aurora says missing payment may delay processing. [Town of Aurora] East Gwillimbury charges a Fire Department review fee at the time of application for an accessory apartment, on top of all applicable building permit fees. [Town of East Gwillimbury]
What building without a permit leads to is the same under the Building Code Act for a basement as for a deck, and our deck permits post sets out what the Act lets a town do. The consequence that belongs to basements is the registration rule above.
How Sonce Homes builds a basement that needs a permit
Sonce Homes does basement renovation across York Region, from framing and wiring to finishes. Of the jobs in this post, a basement apartment is the one with its own set of rules. Sonce builds it to the approved permit drawings, with a kitchen and bathroom of its own, fire separation between the units, exits and egress windows.
If you are planning a bathroom, a bedroom or a second unit below grade, send us the address and what you want the space to be. The office your house answers to decides which of the lists above applies.