Basements
Basement egress window rules in Ontario: size, sill and window well
A floor level with a bedroom needs an outside window that opens without tools: at least 0.35 m² of open area, no side under 380 mm. In a basement, the sill height cap does not apply.
- Published
- Reading time
- 6 min read
- Written by
- Sonce Homes

The egress window in a basement: size, opening and exit
A basement egress window has to open at least 0.35 m² with no side under 380 mm, and it has to open from the inside without tools. Under Article 9.9.10.1 of the 2024 Ontario Building Code, every floor level with a bedroom needs one. [City of Markham]
Markham's building department gives the reason plainly. The window is the emergency escape for people on that floor, and they must not be delayed in getting to a safe place. That is why it also has to open without keys, tools or special knowledge, such as removing part of the window. [City of Markham]
The wording on this page comes from Markham's Builder Tip No. 83, which reproduces the article as updated to the 2024 code and is dated January 1, 2025. Every code figure here is from that tip unless another town is named. Confirm the current text with your building department before you draw.
Does a basement bedroom need an egress window?
It does, unless a door on that level leads straight outside. The article asks for at least one qualifying window on every floor level containing a bedroom in a suite, so the count that matters is the floor levels with a bedroom, not the number of bedrooms. [City of Markham] That is this article only; ask the building department what else applies to each bedroom.
A door replaces the window only when it is on the same floor level as the bedroom and gives direct access to the exterior. For a basement suite, Oshawa's guide to the 2024 code gives the examples: an exterior walk-up stair or a basement walk-out. [City of Oshawa] As Markham reproduces the sentence, it names no other exception, and no sprinkler exception. [City of Markham]
A basement with no bedroom is not caught by this sentence, since a bedroom is what triggers it. A second unit raises exit questions of its own (below), so check with the building department before assuming a basement needs nothing.
That makes the label on your drawings matter. Our reading, not a building department's ruling: a room drawn as a bedroom brings the window rule with it. In Newmarket those drawings go to the Town in any case, since finishing a basement is on its permit list. [Town of Newmarket] If a room could go either way, an office or a bedroom, ask how it will be counted before you commit to a layout.
How big does the opening have to be?
At least 0.35 m² of clear open area, with no dimension less than 380 mm. The sentence calls it an individual, unobstructed open portion, and the window has to hold that opening without needing additional support. [City of Markham] The full set of tests:
| Test | What Article 9.9.10.1 asks |
|---|---|
| Open area | At least 0.35 m², individual and unobstructed |
| Smallest dimension | No dimension of the opening less than 380 mm |
| Staying open | Holds the opening without additional support |
| Operation | Opens from the inside without tools |
| Sill height | At most 1000 mm above the floor, except in basement areas |
| Clearance in a window well | At least 550 mm in front of the window |
The two size tests work together, and the area is the harder one to hit. For a rectangular opening only 380 mm wide, the height would have to be about 921 mm to reach 0.35 m². An opening 600 mm by 600 mm gives 0.36 m², which clears both tests by a little. Those are our sums for illustration; check them against your own measured opening.
Measure what is open, not the frame or the glass. A sash that needs a part removed before you can climb through does not pass. [City of Markham]
Which window types count as egress?
The article names no window style except sliders, so for any window the question is whether it passes the tests with the sash open. [City of Markham]
- A fixed or picture window never counts. The sentence asks for an outside window that opens from the inside, and a fixed one does not open.
- A slider counts by its opening part. The area and dimension tests apply to the openable portion, not the whole frame.
- A window that has to be propped or held to reach its opening fails the test for staying open without support.
- A casement, or any other sash that swings out toward a window well, must not cut into the well's clearance in a way that would restrict escape.
[City of Markham]
An awning or a hopper window is not ruled in or out by the article. What counts is the open portion it leaves, measured against 0.35 m² and 380 mm, with the sash holding itself open.
How high can the sill be in a basement?
The 1000 mm maximum sill height does not apply to basement areas. The article sets that limit for the required window "except for basement areas", measured above the floor. [City of Markham]
If you have read a sill limit for a basement bedroom window elsewhere, it is not in Ontario's sentence. The other tests still apply in full, including the 550 mm clearance where there is a well. [City of Markham]
What does the window well need?
Where the window opens into a window well, at least 550 mm of clearance has to be provided in front of the window. [City of Markham] Treat that as space to keep empty, not a dimension to shave when the well gets tight.
The swing matters as much as the width. If the sash swings toward the well, opening it must not reduce that clearance in a way that would restrict escape in an emergency. [City of Markham]
Drainage can belong on the permit drawings too. Oshawa's basement renovation guide asks the floor plan to show the location, size and design of all new window wells, showing how trapped water is to be drained. [City of Oshawa] That is Oshawa's application requirement under the same provincial code, so ask your own building department whether it wants the same.
A well that holds water sits right against the wall of a finished room, and everything in a finished basement depends on the space staying dry.
Is an egress window enough for a basement apartment?
Not on its own. In a basement apartment the window is one part of the exit question, and the unit has other rules to meet.
Oshawa's guide to the 2024 code says a basement secondary suite needs an egress window meeting 9.9.10.1, unless a door on the basement level gives direct access to the exterior, such as an exterior walk-up stair or a basement walk-out. [City of Oshawa] Oshawa wrote it for its own applicants, so confirm what your municipality asks.
The rest of the unit has its own list: your municipality's zoning, and a Building Code that covers ceiling height and fire separation as well as exits. A second unit needs a building permit, and many municipalities register them too. Our post on basement renovation permits in York Region goes through those approvals town by town.
Enlarging a small basement window: permit, cut, well
Where an existing basement window is too small, enlarging it is structural work and part of the permit.
Towns draw the line at the size of the opening. Newmarket lists new or enlarged windows among the projects that need a building permit, and says replacing windows the same size as the existing ones typically does not. [Town of Newmarket] East Gwillimbury exempts window repair or replacement only when the size of the openings stays the same. [Town of East Gwillimbury] The permit question starts the moment the opening grows.
The order of work follows from that:
- Decide which rooms are bedrooms, since that sets the rule.
- Show the enlarged opening and any new well on the permit drawings, including how the well drains, which Oshawa's guide asks to see. [City of Oshawa]
- Cut and frame the opening and set the window once the permit is issued.
- Build the well with its 550 mm clearance, its drainage and any cover that opens from the inside.
- Finish the interior around the window.
Work done under a permit is built to the permit drawings and inspected under the permit. None of the town pages above says what review the cut itself needs, so raise it with the building department when you apply. The inspection steps are in our basement permits post.
How we fit an egress window into a basement plan
A bedroom below grade needs a window large enough to climb out of. Where an existing basement window is too small, we enlarge it as structural work, and it goes in the permit. For a basement apartment, exits and egress windows are part of the scope, and the unit is built to the approved permit drawings.
If you are not sure yours passes, send us the opening's width and height measured with the sash open, a photo of the window from inside, and a photo of the well or the ground outside it. Tell us which rooms are planned as bedrooms too, since that decides whether the rule applies.